
You are here: Home » Case Studies »
Solar PV: Whitstable, Kent, Yellowjack Construction Limited
In 2017 we installed this Flat Roof (Single Ply Membrane) Solar PV System for Yellowjack Construction Limited (47 Old Bridge Road, Whitstable) in Kent.
Customer: | Yellowjack Construction Limited |
Product: | Developer PV |
Location: | Whitstable, Kent, CT5 |
Solar System Size: | 1.5 kWp |
Panels: | Shinetime |
Inverter: | Enphase 250w Micro inverters |
Solar Generation: | 1,499 kWh p/a |
Carbon Offset: | 745 Kg/CO2/Yr |
When a previous supplier could not fulfil our customer’s needs, TLGEC were able to swoop in and save the day, while helping our customer save money on energy expenses.
With the energy crisis making to speed up our transition to green energy, it’s not just individual homeowners, but businesses stepping up that has the potential to really shift attitudes towards solar energy.