
You are here: Home » Case Studies »
Solar PV: Croydon, Surrey, The Turnball Group
We recently installed this Solar PV System for The Turnball Group in Croydon, Surrey.
Customer: | The Turnball Group |
Product: | Developer Solar PV |
Location: | Croydon, Surrey, CR2 |
Solar System Size: | 5.31 kWp |
Panels: | Trina black 295 x18 |
Inverter: | Solis mini 1.5 x3 |
Solar Generation: | 4,362 kWh p/a |
Carbon Offset: | 2,307 Kg/CO2/Yr |
When a previous supplier could not fulfil our customer’s needs, TLGEC were able to swoop in and save the day, while helping our customer save money on energy expenses.
With the energy crisis making to speed up our transition to green energy, it’s not just individual homeowners, but businesses stepping up that has the potential to really shift attitudes towards solar energy.