Battery Storage: Lancing, West Sussex, Mr S
This project was the very first triple stacked Powerwall system to go in the UK. This was a challenge, working in tight conditions. Once completed the customer now has a whopping 40.5 kWh of storage. This works perfectly with his 10 kWp PV system. All this was achieved on a single phase supply.
Customer: | Mr S |
Product: | Battery Storage |
Location: | Lancing, West Sussex, BN15 |
System Size: | 40.5 kWh |
Battery Type: | Tesla Powerwall 2 |
Backup/Storage: | Storage |
click tesla image to enlarge
Nice work, installing 3 x Powerwall 2s, fitted in our nice wide open area! and not a crowbar used either.
First triple domestic install in the country.
When a previous supplier could not fulfil our customer’s needs, TLGEC were able to swoop in and save the day, while helping our customer save money on energy expenses.