
Powering collaboration: Solar PV and EV Charging
TLGEC provides renewable energy solutions to power the Maidstone Innovation Centre’s co-working space.
You are here: Home » Case Studies »
Battery Storage: Lancing, West Sussex, Mr S
This project was the very first triple stacked Powerwall system to go in the UK. This was a challenge, working in tight conditions. Once completed the customer now has a whopping 40.5 kWh of storage. This works perfectly with his 10 kWp PV system. All this was achieved on a single phase supply.
Customer: | Mr S |
Product: | Battery Storage |
Location: | Lancing, West Sussex, BN15 |
System Size: | 40.5 kWh |
Battery Type: | Tesla Powerwall 2 |
Backup/Storage: | Storage |
click tesla image to enlarge
Nice work, installing 3 x Powerwall 2s, fitted in our nice wide open area! and not a crowbar used either.
First triple domestic install in the country.
TLGEC provides renewable energy solutions to power the Maidstone Innovation Centre’s co-working space.
We installed a solar pv system at a business in Kent. Read on to find out more about this exciting commercial project.
TLGEC is excited to be pioneering the UK’s first collaboration between charge point management software specialist, Clenergy EV and leading EV charging manufacturer, Easee.