
You are here: Home » Case Studies »
Battery Storage: Tunbridge Wells, Kent, Mr B
This is one of our many Powerwall 2 installs. We were the first in the UK to install Tesla Powerwall and have been recognised as one of the top installers in the UK.
Having been inconvenienced in the past by power outages, this customer is keen to enjoy the power cut protection provided by the Backup Gateway which is now installed as standard with the Powerwall.
The customer will also take advantage of time-of-use cheap energy tariffs. By charging the batteries while electricity is at its least expensive he’ll keep control of his bills.
Customer: | Mr B |
Product: | Tesla Powerwall Battery Storage |
Location: | Tunbridge Wells, Kent, TN2 |
System Size: | 27.0 kWh |
Battery Type: | Tesla Powerwall 2 |
Backup/Storage: | Storage and Backup |
click tesla image to enlarge
Brilliant, efficient, timely, professional.
When a previous supplier could not fulfil our customer’s needs, TLGEC were able to swoop in and save the day, while helping our customer save money on energy expenses.
With the energy crisis making to speed up our transition to green energy, it’s not just individual homeowners, but businesses stepping up that has the potential to really shift attitudes towards solar energy.