
Powering collaboration: Solar PV and EV Charging
TLGEC provides renewable energy solutions to power the Maidstone Innovation Centre’s co-working space.
You are here: Home » Case Studies »
Battery Storage: Tunbridge Wells, Kent, Mr B
This is one of our many Powerwall 2 installs. We were the first in the UK to install Tesla Powerwall and have been recognised as one of the top installers in the UK.
Having been inconvenienced in the past by power outages, this customer is keen to enjoy the power cut protection provided by the Backup Gateway which is now installed as standard with the Powerwall.
The customer will also take advantage of time-of-use cheap energy tariffs. By charging the batteries while electricity is at its least expensive he’ll keep control of his bills.
Customer: | Mr B |
Product: | Tesla Powerwall Battery Storage |
Location: | Tunbridge Wells, Kent, TN2 |
System Size: | 27.0 kWh |
Battery Type: | Tesla Powerwall 2 |
Backup/Storage: | Storage and Backup |
click tesla image to enlarge
Brilliant, efficient, timely, professional.
TLGEC provides renewable energy solutions to power the Maidstone Innovation Centre’s co-working space.
We installed a solar pv system at a business in Kent. Read on to find out more about this exciting commercial project.
TLGEC is excited to be pioneering the UK’s first collaboration between charge point management software specialist, Clenergy EV and leading EV charging manufacturer, Easee.