
Powering collaboration: Solar PV and EV Charging
TLGEC provides renewable energy solutions to power the Maidstone Innovation Centre’s co-working space.
You are here: Home » Case Studies »
Solar PV: East Grinstead, West Sussex, Gilbert and Stamper Ltd
We recently installed this 72 Panel Solar PV System for Gilbert and Stamper Ltd in East Grinstead, West Sussex.
Customer: | Gilbert and Stamper Ltd |
Product: | Developer Solar PV |
Location: | East Grinstead, West Sussex, RH19 |
Solar System Size: | 3.6 kWp |
Panels: | Solarcentury Ce21 solar tiles (x72) |
Inverter: | Solar River |
Solar Generation: | 3,090 kWh p/a |
Carbon Offset: | 1,755 Kg/CO2/Yr |
TLGEC provides renewable energy solutions to power the Maidstone Innovation Centre’s co-working space.
We installed a solar pv system at a business in Kent. Read on to find out more about this exciting commercial project.
TLGEC is excited to be pioneering the UK’s first collaboration between charge point management software specialist, Clenergy EV and leading EV charging manufacturer, Easee.